Mission record
Phoenix
Also known as Phoenix Mars Lander, PhoenixMarsLander
National Aeronautics and Space Administration · Launched
Explore trajectoryCompleted · Success
Phoenix launched on 04 August 2007 on a Delta II 7925 from Cape Canaveral Air Force Station, and its 681 million km heliocentric cruise to Mars took approximately 10 months. At 1 km altitude the parachute was released and a powered descent and soft-landing was achieved using a pulsed propulsion system with 8 thrusters, which turned off when footpad sensors detected touchdown. The landing site is in the north polar region between 65 and 72 degrees N, a relatively boulder-free area with a high ratio of ice to rock. Communications were maintained through the relays on the orbiting Mars spacecraft Mars Reconnaissance Orbiter and Mars Express throughout the descent. As the summer ended the mission had less solar energy to operate and made its last transmission on 02 November 2008 before power was depleted.
- Destinations
- Launch vehicle
- Delta II
- Launch site
- Cape Canaveral, United States
- Countries
- United States
- Mission types
- Lander
Chronology
Mission timeline
Launch
Launched on a Delta II 7925
Phoenix launched on 04 August 2007 at 09:26:34 UT (5:26 a.m. EDT) on a Delta II 7925 from Cape Canaveral Air Force Station, and the launch/orbital information page gives the same instant as 2007-08-04T09:26:34Z with Launch Vehicle: Delta II. The committed vehicle string is the Facts in Brief one, Delta II, and the fuller Delta II 7925 the text prints is recorded here rather than in the field.
EarthLanding
Soft-landed in the north polar region
Touchdown occurred at 23:53:44 UT (7:53:44 p.m. EDT) on 25 May. The landing site is in the north polar region between 65 and 72 degrees N, nominally at 68.15 N, 125.9 W, a relatively boulder-free area with a high (30-60%) ratio of ice to rock. Surface temperatures in this region range between about 190 and 260 K and the landing altitude is about 3.5 km below the planetary reference. The launch/orbital information page prints Decay Date: 2008-05-25, the same day.
MarsMission end
Last transmission before power was depleted
As the summer ended the mission had less solar energy to operate and made its last transmission on 02 November 2008 before power was depleted. Cost of the mission is estimated at $417 million.
Mars
Mission architecture
Vehicles
Phoenix Mars Lander · Lander
Destinations: Mars
Trajectory record
Trajectory dataset not yet available
No verified trajectory dataset is committed for this mission, so Mission Atlas renders no path.
Provenance
Sources
Each source is listed once and labeled with the mission, event, trajectory, or destination/body context it supports.
Data verified through September 2, 2026
- Phoenix Mars Lander - NSSDCA Master Catalog (spacecraft 2007-034A), archived snapshot — NSSDCAArchive · Supports: mission claims · event claims
- Phoenix Mars Lander - NSSDCA launch/orbital information (2007-034A), archived snapshot — NSSDCAArchive · Supports: mission claims · event claims
- Chronology of Mars Exploration - NASA NSSDCA, archived snapshot — NSSDCAArchive · Supports: mission claims · event claims
- Planet Sizes and Locations in Our Solar System — NASAOther · Supports: destination/body context