Completed · Success
NASA's Magellan orbiter mapped Venus with synthetic aperture radar from 1990 to 1994. Deployed from Space Shuttle Atlantis on STS-30R, it entered Venus orbit on 10 August 1990, imaged about 98 percent of the surface over three 243-day mapping cycles, then collected a global gravity field, performed the first planetary aerobraking demonstration, and was deliberately flown into the Venusian atmosphere; radio contact was lost on 12 October 1994.
- Destinations
- Venus
- Launch vehicle
- Space Shuttle Atlantis (STS-30R) with two-stage Inertial Upper Stage (IUS)
- Launch site
- Kennedy Space Center, Fla. / Launch Complex 39B
- Countries
- United States
- Mission types
- Orbiter
Chronology
Mission timeline
Launch
Launch aboard Space Shuttle Atlantis (STS-30R) from LC-39B
NSSDCA's launch/orbital record gives the launch epoch as 1989-05-04T18:46:59Z; NASA's STS-30 mission page gives 2:46:59 p.m. EDT, the same instant. The NASA Science Magellan page states 18:47:00 UT, one second later.
EarthDeployment
Released from Atlantis payload bay; IUS ignition one hour later
NASA Science: released at 01:01 UT on 5 May 1989 from the payload bay, with the two-stage Inertial Upper Stage firing one hour later. NASA's STS-30 page states the payload "was deployed six hours, 14 minutes into flight", consistent with an 18:46:59 UT liftoff.
EarthOrbit insertion
Venus orbit insertion
Arrived in a near-polar Venus orbit of 297 x 8,463 km at 85.5 degrees inclination. No primary source fetched gave a time of day for the insertion burn.
VenusMilestone
Radar mapping Cycle 1 begins
Magellan began returning high-resolution radar images showing volcanism, tectonic movement, lava channels and pancake-shaped domes.
VenusMilestone
Cycle 1 complete: 83.7 percent of Venus imaged
The first 243-day mapping cycle ended on 15 May 1991, providing the first clear views of 83.7 percent of the surface (NSSDCA rounds this to about 84 percent).
VenusMilestone
Cycle 2 complete: coverage raised to 96 percent
Cycle 2 filled gaps left by Cycle 1 and imaged the southern polar region. Recorded at month precision because sources disagree on the closing day of the cycle.
VenusMilestone
Cycle 3 complete: stereo imaging, coverage 98 percent
Recorded at month precision because primary sources disagree on the day: NASA Science states the third cycle ended 13 September 1992, while NSSDCA states Cycle 3 "began on 24 Jan. 1992 and lasted until 15 Sept. 1992".
VenusMilestone
Cycle 4 complete: gravity data from the elliptical orbit
Cycle 4 acquired gravity-field data rather than radar images, with Magellan transmitting a constant radio signal for Doppler tracking. Recorded at month precision because sources disagree on the closing day of the cycle.
VenusMilestone
Aerobraking campaign begins, circularizing the orbit
NSSDCA states aerobraking was "performed from 24 May until 02 August 1993", ending with a 180 x 540 km orbit and a 94-minute period. The JPL Magellan Summary Sheet instead states aerobraking "was completed between May 25 and August 3, 1993", giving 180 x 541 km. First use of aerobraking at a planet. Recorded at month precision because sources disagree on the start day.
VenusMilestone
Cycle 5 complete: high-resolution gravity data for about 95 percent of Venus
Cycle 5 acquired gravity data from the circularized orbit, giving high-resolution gravity data for about 95 percent of the planet. The cycle boundaries are disputed between sources, so no day is asserted.
VenusMilestone
Windmill experiment begins
JPL's 7 September 1994 release states only that Magellan "has begun a unique experiment" and that it "is scheduled to last until September 14". No source dates the start, so the event is held at month precision.
VenusImpact
Predicted destruction in the Venusian atmosphere (never observed)
The destruction was predicted, not observed. JPL's 13 October weekly report states "The spacecraft should land on Venus by 1:00 PM PDT Thursday, October 13, 1994"; the 12 October release said Magellan "is expected to burn up in the planet's upper atmosphere within two days"; NSSDCA states it "presumably burned up in the atmosphere on 13 or 14 October 1994". No day can be asserted, so month precision is recorded.
VenusMilestone
Final orbit trim maneuvers lower periapsis to 139.7 km
NSSDCA: "Magellan began its final descent into the Venus atmosphere on 11 October 1994." JPL's 12 October release says the thrusters "were fired in four sequences on Tuesday, Oct. 11", while JPL's 13 October weekly report describes "an aggressive series of five Orbit Trim Maneuvers (OTMs) on Tuesday, October 11".
VenusMission end
JPL declares the Magellan mission ended
JPL's release of 12 October 1994 states the mission "ended today when ground controllers lost contact with the spacecraft", after mapping 98 percent of the surface and compiling gravity data for 95 percent of the planet.
VenusLoss of contact
Loss of signal on orbit 15032
Tracking stations lost the radio signal at 10:02 UT (3:02 a.m. PDT) as Magellan was about to enter Earth occultation on orbit 15032, with the spacecraft power-starved. NSSDCA agrees on 12 October at 10:02 UT and lists a decay date of 1994-10-12. The NASA Science mission page instead states "Contact was lost after 10:05 UT Oct. 13, 1994", which the two contemporaneous JPL reports contradict.
Venus
Mission architecture
Vehicles
Magellan · Orbiter · completed
Destinations: Venus
Trajectory record
Trajectory dataset not yet available
No verified trajectory dataset is committed for this mission, so Mission Atlas renders no path.
Provenance
Sources
Each source is listed once and labeled with the mission, event, trajectory, or destination/body context it supports.
Data verified through August 23, 2026
- Magellan - NASA Science — NASAMission page · Supports: mission claims · event claims
- Magellan - NASA NSSDCA Spacecraft Details (1989-033B) — NSSDCAArchive · Supports: mission claims · event claims
- Magellan - NSSDCA Launch/Orbital Information (1989-033B) — NSSDCAArchive · Supports: mission claims · event claims
- STS-30 - NASA — NASAMission page · Supports: mission claims · event claims
- Magellan Status Report - October 12, 1994 — JPLTechnical document · Supports: mission claims · event claims
- Magellan Status Report - October 13, 1994 (Magellan Significant Events for Week Ending 10/14/94) — JPLTechnical document · Supports: mission claims · event claims
- Magellan Begins Windmill Experiment (JPL news release, September 7, 1994) — JPLTechnical document · Supports: mission claims · event claims
- Magellan Summary Sheet — JPLTechnical document · Supports: mission claims · event claims
- Deep Space Robotic Firsts - NASA Science — NASAOther · Supports: mission claims
- Planet Sizes and Locations in Our Solar System — NASAOther · Supports: destination/body context